Completed in 2010, ABMB provided all design related to the replacement of seven pump stations with new equipment and systems designed for greater capacities. The firm performed all topographic and property survey, geotechnical investigations, proposed site selection and layout, proposed pump station configuration, hydraulic calculations, mechanical and electrical equipment selection, and instrumentation/control requirements. The design included one triplex pump station (5.98 MGD) with variable speed motors and an electrical building. Standby generators are also being facilitated at each station.